Demand
- annual quantity
- typical flow
- peak and peak duration
The useful question is not “Which is always cheaper?” It is: which route covers actual demand at the required quality and pressure, with a credible reserve?
A generator can reduce delivery dependence, but it transfers responsibility to the onsite chain of power, compressor, air treatment, generator, storage and maintenance. Demand, peaks, gas quality, pressure, logistics, space and required availability decide the route.
| Route | Typical strength | Key check |
|---|---|---|
| Cylinder or bundle | simple entry for small, irregular or mobile demand | changeover, storage, handling and full delivery cost |
| Liquid/bulk | central supply of larger volumes | vaporisation, minimum take, losses, delivery windows and reserve |
| Onsite | demand-led generation at the facility | compressor, energy, treatment, maintenance, storage and backup |
| Hybrid | onsite base load plus delivered peaks or reserve | changeover, ownership and periodic functional checks |
Invoices show cost but do not always show actual demand. Delivery quantities, measurements and production time should be reconciled.
Gas, rental, transport, surcharges, minimum quantities, losses, internal handling and staff time belong in the baseline.
Compressor reserve, space, heat rejection, power, pipe route, noise, ventilation, storage and safe operation determine feasibility.
These are screening cues, not a decision without data.
Cylinders can fit small or mobile demand. A generator becomes more relevant when regular demand, suitable infrastructure and a credible full-cost case exist. Reserve and operating responsibility also belong in the decision.
Bulk supply can cover large central demand. Onsite generation can reduce logistics but needs energy and maintenance. Compare the same quantity, quality, pressure and availability over the same period.
No. Delivered reserve can still protect peaks, service or critical processes. Hybrid supply is a valid design route.
Invoices, delivery quantities, operating time and known process data are enough for an initial structured review.